Wednesday, 10 September 2025

Unexpected problem and plan for the the next month

 After the relatively good results from the month of August, I was preparing to tackle new goals and new challenges for the upcoming month, until a serious connectivity problem occurs to Eve Online servers, marine fiber optic cables passing through the red sea were damaged, and as I am living in the middle east region, I am heavily affected by this issue, eve online is really slow and unplayable right now (playing Factorio instead), game windows take forever to open, MWD trick in low sec is very risky, even Eve Guru can’t update sometimes, press says that it could take months to repair the cables, I am just following the matter and hoping for the best.

The milestone for the next month (hopefully) is to produce and sell 25 freighters, and at least one combat capital ship, and of course the maximum of T2 items, already materials for 7 freighters arrived to the manufacturing station, some capital parts are under construction, it will be some sort of miracle if I can do it with this connectivity issue, but I will try, the chosen combat ship to be produced is Archon the Amarrian carrier, my aim is to achieve 15 billion ISK net worth growth.

Regarding the relocation of the capital manufacturing station, the decision was canceled, paying more and having completed ships in around 4 days is better than having them in 9 days, after all I was still making profit even with higher manufacturing fees, Eve Guru and Isk per hour tools confirmed this.

To lower manufacturing fees, I am thinking about anchoring my own engineering complex soon, to manufacture capital parts there, then move them to the Sotiyo for ship assembly, need to investigate more about the logistical feasibility of this move, not very clear yet.

 

No comments:

Post a Comment